Worldwide presence
Olkiluoto 3: 3D simulation of plant commissioning
In September 2005, the first block of the EPR™ reactor was laid on the site of Olkiluoto 3 in Finland. In parallel with this work, tests on the equipment and systems are carried out to validate the energy generation process of the future power plant. Virtual procedures to revisit.
With industrial locations in 43 countries and a sales network in more than 100 countries, AREVA is developing its operations on every continent.
An international presence that the group seeks to reinforce in a balanced manner between Europe, North America, and Asia.
"AREVA at a glance" brochure
AREVA strengthens its footing in Japan

