Weekly report : from October 31, 2002 through November 6, 2002
Press release
November 07, 2002
Treatment activity :
During this week, 21.2 tons of spent fuel assemblies from EDF and Goesgen Swiss power plants have been processed on the site.
From all treated assemblies, a total of 817.8 tons have been processed to date this year.
Four of the six lines of vitrification of fission products* were in service. Since the beginning of the year, 466 canisters have been produced.
Shipment activity :
A shipment containing one cask with 7 spent fuel assemblies from the Borssele** power plant's arrived the November 7th at 9:31 am at the railway terminal of Valognes.
* The fission products (ultimate residues of spent fuel) are incorporated in heated glass to approximately 1100°C. The whole is poured in stainless steel containers. The fission products are an integral part of stable, compact and resistant glass. This process is called vitrification.
** Pressurized Water Reactor operated by EPZ (Elektriciteits-Produktiemaatschappij Zuid).

Report on diversity 2010
Field Report: Discover pragmatic examples of customer benefits
2007 figures: Economic, social, societal and environmental data
2006 figures: Economic, social, societal and environmental data
Rapport environnemental social et sociétal de COMURHEX Malvési 2010 [FR]
"Comurhex II" brochure
AREVA in India Press kit
"Georges Besse II" brochure
2010 Status of Safety at AREVA group facilities
Rapport de sûreté nucléaire et radioprotection 2009 du site du Tricastin