From January 9, 2003 through January 15, 2003

Press release

January 16, 2003

Treatment activity :
During this period, 3 tons of spent fuel assemblies from Brünsbüttel (Germany) power plant have been processed on the site.
The actuality, it is also... Works of disassembling of the old pipe of liquid releases are in progress... Old pipe disassembling works, located between the fense of the site and the foot of cliff, are in progress in accordance with the program, with in particular the earthworks in cliff for the installation of the structures of maintenance.
The results of measures performed in accordance with the specific programme of monitoring of the environment of the site are all lower than 1 Bq/g*.

*1 becquerel per gramme