At the UP2 plant, a technical problem without incidence on the safety of the facilities has meant the standby of the shearing operations since the 01st of December, in the R1 head-end facility.
Repair operations are in progress.
A total of 760 metric tons of uranium have been processed to date this year.
At the R7 vitrification facility, line B is in service, lines A and C are on standby.
A total of 449 canisters of glass have been produced to date this year.
At the UP3 plant, the T1 head-end facility is on standby. Monitoring operations are in progress.
A total of 387 metric tons of uranium have been processed to date this year.
At the T7 vitrification facility, lines A, B and C are in service.
A total of 303 canisters of glass have been produced to date this year.

Report on diversity 2010
Field Report: Discover pragmatic examples of customer benefits
2007 figures: Economic, social, societal and environmental data
2006 figures: Economic, social, societal and environmental data
Rapport environnemental social et sociétal de COMURHEX Malvési 2010 [FR]
"Comurhex II" brochure
AREVA in India Press kit
"Georges Besse II" brochure
2010 Status of Safety at AREVA group facilities
Rapport de sûreté nucléaire et radioprotection 2009 du site du Tricastin