At the UP2 plant, shearing of fuel assemblies from a batch of 1300 MWe EDF fuel is in progress in the R1 head-end facility.
A total of 481 metric tons of uranium have been processed to date this year.
At the R7 vitrification facility, lines A and B are in service, line C is on standby. A total of 275 canisters of glass have been produced to date this year.
At the UP3 plant, T1 head-end facility is on shutdown period for maintenance.
A total of 231 metric tons of uranium have been processed to date this year.
At the T7 vitrification facility, lines A and B are on standby, line C is going on again.
A total of 162 canisters of glass have been produced to date this year.
Work on the pipe : works equipment clearance is finished and indicates then the end of the work to reposition the pipe.

Report on diversity 2010
Field Report: Discover pragmatic examples of customer benefits
2007 figures: Economic, social, societal and environmental data
2006 figures: Economic, social, societal and environmental data
Rapport environnemental social et sociétal de COMURHEX Malvési 2010 [FR]
"Comurhex II" brochure
AREVA in India Press kit
"Georges Besse II" brochure
2010 Status of Safety at AREVA group facilities
Rapport de sûreté nucléaire et radioprotection 2009 du site du Tricastin