Weekly report : from April 12 through April 19, 2000
Press release
April 21, 2000
At the UP2 plant, the shearing line is on stand-by in the R1 head-end facility. A total of 192 metric tons of uranium have been processed to date this year.
At the R7 vitrification facility, lines A and B are in service. Line C is on stand-by. A total of 101 canisters of glass have been produced to date this year.
At the UP3 plant, the shearing lines are on stand-by in the T1 head-end facility. A total of 86 metric tons of uranium have been processed to date this year.
At the T7 vitrification facility, line A is on stand-by, lines B and C are in service. A total of 73 canisters of glass have been produced to date this year.
Work in the Moulinets Cove
Work continues on modifications to the discharge pipe in the tidal basin:
- the final, lower profile of the sea discharge pipe was achieved on March 17 and pipe covering work is finished;
- the work platform will be removed as soon as meteorological conditions permit.

Report on diversity 2010
Field Report: Discover pragmatic examples of customer benefits
2007 figures: Economic, social, societal and environmental data
2006 figures: Economic, social, societal and environmental data
Rapport environnemental social et sociétal de COMURHEX Malvési 2010 [FR]
"Comurhex II" brochure
AREVA in India Press kit
"Georges Besse II" brochure
2010 Status of Safety at AREVA group facilities
Rapport de sûreté nucléaire et radioprotection 2009 du site du Tricastin