Weekly report : from March 30 through April 5, 2000
Press release
April 07, 2000
At the UP2 plant, shearing operations are on stand-by in the R1 head-end facility. A total of 192 metric tons of uranium have been processed to date this year.
At the R7 vitrification facility, line A is in service. Lines B and C are on stand-by. A total of 88 canisters of glass have been produced to date this year.
At the UP3 plant, shearing operations are on stand-by in the T1 head-end facility. A total of 86 metric tons of uranium have been processed to date this year.
At the T7 vitrification facility, line A is on stand-by, lines B and C are in service. A total of 59 canisters of glass have been produced to date this year.
Work in the Moulinets Cove
Work continues on modifications to the discharge pipe in the tidal basin:
- the final, lower profile of the sea discharge pipe was achieved on March 17;
- placement of the concrete cover over the pipe was completed, making it inaccessible during very low tides.

Report on diversity 2010
Field Report: Discover pragmatic examples of customer benefits
2007 figures: Economic, social, societal and environmental data
2006 figures: Economic, social, societal and environmental data
Rapport environnemental social et sociétal de COMURHEX Malvési 2010 [FR]
"Comurhex II" brochure
AREVA in India Press kit
"Georges Besse II" brochure
2010 Status of Safety at AREVA group facilities
Rapport de sûreté nucléaire et radioprotection 2009 du site du Tricastin