Weekly report : from December 9th to 15th, 2004.
Press release
December 17, 2004
Treatment activity:
During this period, the UP2 800 and UP3 plants treated 5.5 tons of spent fuel assemblies from EDF, french power plants.
From all treated assemblies, a total of 1100.5 tons have been processed to date this year.
During this period, 16 canisters of vitrified fission products have been produced(1) in T7 and R7, vitrification facilities.
Since the beginning of the year, 636 canisters have been produced.
The facility of hulls compaction (ACC) produced 27 canister of compacted residues.
Since the beginning of the year, 1023 canisters have been produced.
The actuality, it is also...
One shipment of 2 cask (TN12/2) of 24 spent fuel assemblies from Göesgen (Switzerland) arrived at the Valognes railway terminal on the December, 10th at 9:43 am. It correspond to 10.25 uranium tons, which allowed to supply 430 000 persons with electricity during one year.
(1)The fission products (ultimate residues of spent fuel) are incorporated in heated glass to approximately 1100°C. The whole is poured in stainless steel containers. The fission products are an integral part of stable, compact and resistant glass. This process is called vitrification.

Report on diversity 2010
Field Report: Discover pragmatic examples of customer benefits
2007 figures: Economic, social, societal and environmental data
2006 figures: Economic, social, societal and environmental data
Rapport environnemental social et sociétal de COMURHEX Malvési 2010 [FR]
"Comurhex II" brochure
AREVA in India Press kit
"Georges Besse II" brochure
2010 Status of Safety at AREVA group facilities
Rapport de sûreté nucléaire et radioprotection 2009 du site du Tricastin