Weekly report : from April 27th to May, 3rd 2006.
Press release
May 04, 2006
Treatment activity:
During this period, the plants treated 3 tons of spent fuel.
From all treated assemblies, a total of 326,5 tons have been processed to date this year.
During this period, 13 canisters of vitrified fission products have been produced(1) in R7 and 10 in T7, vitrification facilities. Since the beginning of the year, 363 canisters have been produced.
The facility of hulls compaction (ACC) produced 15 canisters of compacted residues. Since the beginning of the year, 495 canisters have been produced.
The actuality, it is also...
...Third transport of vitrified waste from France to the Netherlands
28 canisters of vitrified wastes left, on May, 2nd, the TN International's railway terminal of Valognes to the COVRA storage facility in Vlissingen (Netherlands). It was a shipment of 14 tons of vitrified residues, which represent the ultimate residues of 49 uran tons and allowed to supply more than 2 millions of Dutch with electricity during one year.
(1)The fission products (ultimate residues of spent fuel) are incorporated in heated glass to approximately 1100°C. The whole is poured in stainless steel containers. The fission products are an integral part of stable, compact and resistant glass. This process is called vitrification.

Report on diversity 2010
Field Report: Discover pragmatic examples of customer benefits
2007 figures: Economic, social, societal and environmental data
2006 figures: Economic, social, societal and environmental data
Rapport environnemental social et sociétal de COMURHEX Malvési 2010 [FR]
"Comurhex II" brochure
AREVA in India Press kit
"Georges Besse II" brochure
2010 Status of Safety at AREVA group facilities
Rapport de sûreté nucléaire et radioprotection 2009 du site du Tricastin
