Bimonthly Report from July 15th to 28th
July 30, 2010
The facilities is shut down for maintenance.
Since the beginning of the year, 803 tons have been processed for recycling.
In the vitrification facilities 49 canisters of vitrified fission products(1) have been produced. Since the beginning of the year, 366 canisters have been produced.
The facility of hulls compaction produced 44 canisters of compacted residues. Since the beginning of the year, 829 canisters have been produced.
(1)The fission products (ultimate residues of spent fuel) are incorporated in heated glass to approximately 1100°C. The whole is poured in stainless steel containers. The fission products are an integral part of stable, compact and resistant glass. This process is called vitrification.
Contact presse AREVA
Christophe Neugnot
T : 02 33 02 63 22
P : 06 80 93 69 93
christophe.neugnot@areva.com
T : 02 33 02 40 02
P : 06 08 27 05 69
estelle.sennesal@areva.com

Report on diversity 2010
Field Report: Discover pragmatic examples of customer benefits
Rapport environnemental social et sociétal de COMURHEX Malvési 2010 [FR]
12th shipment of vitrified nuclear waste from France to Germany (in french)
24 hours in La Hague
AREVA in India Press kit
Compacting structural and technological waste processing active liquid effluents
2010 Status of Safety at AREVA group facilities
Environmental protection in La Hague (France)
Rapport de sûreté nucléaire et radioprotection 2009 du site du Tricastin
