6/28/2010
According to the law concerning nuclear transparency and safety, AREVA Tricastin publishes the latest edition of its nuclear safety and radioprotection annual report. A real discussion opener, this report enables the monitoring of AREVA’s actions and results at their Tricastin industrial site.
Position Paper – Robustness of the Cooling Function
AREVA WNFC 2012 Presentation
Display of the new factory "Georges Besse II"
Fuel activities brochure
Information report on the nuclear safety and the radiation protection of the INB ECRIN 2011
Rapport de sûreté nucléaire et radioprotection 2009 du site du Tricastin
"Rapport de sûreté nucléaire et radioprotection 2009 du site du Tricastin" [FR]
Fuel solutions: safe and reliable
A transition at Tricastin: diffusion to centrifugation
Historical agreement in civil nuclear in India
March 30, 2010
Le 24 février, une anomalie de remplissage a été détectée lors d’une opération de transfert d’hexafluorure d’uranium (UF6) dans un atelier d’EURODIF Production, situé en amont du procédé d’enrichissement.
L’équipement en cause a été immédiatement vidangé. Les opérations de pesage de la matière récupérée ont confirmé un léger dépassement du seuil de remplissage.
Cette anomalie n’a pas eu de conséquence pour le personnel et l’environnement. Le décalage apparu dans une échéance de vérification périodique du dispositif de surveillance a conduit à formuler auprès de l’Autorité de Sûreté Nucléaire une déclaration au niveau 1 de l’échelle internationale des événements nucléaires (échelle INES) graduée de 1 à 7.