AREVA wins a major contract to perform ten-year inspections for the third time on French 900 MWe reactors
Press release
FINANCE / REACTORS AND SERVICES
June 19, 2007
AREVA has won a major design and modernization contract from EDF worth more than €100 million for its thirty-four French 900 MWe nuclear reactors commissioned between 1977 and 1987.
This new inspection campaign will run over a period of ten years starting in 2009 on the Tricastin (Drôme) and Fessenheim (Haut-Rhin) sites.
For each reactor, AREVA will carry out improvements to the instrumentation and control system and add technological improvements to the mechanical systems.
This new contract is confirmation of AREVA's capability in outage services, engineering, and system upgrading. The group has taken part in the first two ten-year inspections of France's 900 MWe reactor fleet, and since 2005 has been involved in the second round of inspections on France's twenty 1,300 MWe reactors. AREVA has also carried out ten-year inspections in Koeberg, South Africa, and Daya Bay, China, with the support of its local subsidiaries, Lesedi and SNE, respectively.
Contacts
- AREVA press office:
Patricia Marie / Fleur Floquet-Daubigeon / Maxime Michaut
Tel: +33 1 34 96 12 15 - Fax: +33 1 34 96 16 54
email: press@areva.com - AREVA Investors Relations:
Marie de Scorbiac
Tel: +33 1 34 96 05 97
email: marie.descorbiac@areva.com
Philippine du Repaire
T: +33 (0) 1 34 96 11 51
email: philippine.durepaire@areva.com

2010 Reference document
"AREVA at a glance" brochure
Report on diversity 2010
2007 figures: Economic, social, societal and environmental data
2009 Annual Results
Field Report: Discover pragmatic examples of customer benefits
The Path of Greatest Certainty: brochure
"Nuclear: energy for today and tomorrow" ad-information
COMURHEX II: meeting tomorrow’s challenges
EPR™ Safety Robustness
