In Flamanville, the EPR™ has been added to the two electricity production units already in service on the site. A step by step and computer generated images of a construction project whose construction lasted 6 years: from the construction of the concrete and steel structures to the launch tests.
Copy this code
In Flamanville, the EPR™ has been added to the two electricity production units already in service on the site. A step by step and computer generated images of a construction project whose construction lasted 6 years: from the construction of the concrete and steel structures to the launch tests.
6/1/2009 - 07:48 min
Field Report: Discover pragmatic examples of customer benefits
Outage Optimization - brochure
EPR™ Safety Robustness
EPR™ Safety Robustness
The Path of Greatest Certainty: brochure
Brochure - The 1600+ Mwe reactor
Feedbacks from our customers: John T. Carlin
Feedbacks from our customers: Robert J. Duncan
Susan Easterling, Ingénieur génie civil (USA)
Michel Bioulac, Department Manager (France)

As the world leader in the construction of nuclear reactors and in replacement of heavy equipment for power plants, AREVA has a duty to provide the best. Case studies promote a better understanding of the challenges at stake, whether these concern the arrival of the EPR™ reactor and its upgrades or the conditions for replacing steam generators.
The AREVA Clean Energy Park concept: a sustainable answer to the world’s energy needs
The design of the EPR™, the first generation III+ reactor, reflects the group's expertise in terms of competitiveness and safety.
"Flamanville 3 Project" (EDF)
In Flamanville, the EPR™ has been added to the two electricity production units already in service on the site. A step by step and computer generated images of a construction project whose construction lasted 6 years: from the construction of the concrete and steel structures to the launch tests.
The reactor coolant system insures the extraction of the heat drawn in the nuclear reactor