AREVA logo

11/6/2010

Eleventh shipment of vitrified nuclear waste from France to Germany (in french)

Infos

Vendredi  5 novembre à 14h20 est parti du terminal ferroviaire de Valognes en France un transport de déchets vitrifiés en direction du site d’entreposage de Gorleben en Allemagne.

Publish

Copy this code

Associated documents

  • Eleventh shipment of vitrified nuclear waste from France to Germany (in french)

    Vendredi  5 novembre à 14h20 est parti du terminal ferroviaire de Valognes en France un transport de déchets vitrifiés en direction du site d’entreposage de Gorleben en Allemagne.

  • 11/6/2010 - 3:50 min

AREVA's operations

AREVA's activities are organized into five Business Groups. Mines groups the uranium mines exploration and operation activities. The Front End converts and enriches the uranium and designs the fuel for the nuclear reactors. Reactors and Services groups the activities of design and construction of nuclear reactors and propulsion and research reactors, and the activities of maintenance of the nuclear power plants. The Back End recycles the used fuel and provides transport, clean-up and dismantling services. Renewable Energy develops wind energy, bioenergy, solar power and hydrogen power solutions.

EPR™ reactors around the world