Water consumption reduced by half |
|
|||||
Regulating waterflow By the summer of 2004, the water meters had been adjusted at the UP1 plant and all faulty valves had been replaced. Sealing caps were installed on all pipes not currently in use. In early 2005, the program was completed with the installation of a system to regulate the supply of water to cool blowdown valves on production lines. * Now AREVA NC |